Chambers
Bid type
Start from template
Site Discovery
What this bid covers
Prints under Scope of Work on the quote. Leave blank to omit.
Crew & Labor
Crew size
3
Hourly rate
per hour
$
Overtime hrs/day
at 1.5×
Person-hours
0 hrs
Travel & Per Diem
Getting there
Airfare
nonstop · 6am–8pm · per person
$
Override: set to $1,200 flat if nonstop unavailable
Lodging · per room
2 techs share · per night
$
Per Diem · Flat
fixed $75/day · per person
$
Vehicle
day / vehicle
$
Travel days · labor
per hour · per person
$
Vehicle type
Qty
auto
7d · Quote options
Alternate parts packages · customer sees part #, qty and cost · links stay internal
7c · Site Survey
PM on site + travel days, airfare, car, hotel, per diem
Site survey total
$0
Profit Margin
Applied to travel · equipment · materials
%
0%
Profit · $0
50%
Deposit · paid when they send the order
Collected when the Purchase Order is issued
%
10%
Deposit · $0
50%
Geometry · feet
0 sqft surface
Length
ft
Width
ft
Height
ft
Schedule
Job type
Chamber scope · what's included
Chamber (walls · floor · ceiling)
→ 0 d
Walls
0 days
Floor
0 days
Ceiling
0 days
Steel Shield
→ 0 d
Absorber
0 pcs → 0 d
Surfaces
Cone size
Per-surface breakdown
Surface
Cones · Frame · Total
Short walls (W×H, ×2)
0 · 0 · 0 ea
Long walls (L×H, ×2)
0 · 0 · 0 ea
Floor (L×W)
0 · 0 · 0
Ceiling (L×W)
0 · 0 · 0
In-scope total
0 · 0 · 0
Override total (0 = use auto)
pcs
Raised Floor (floor × 1.25)
Turntable
Ferrite install
Custom tasks
Auto total
0 work days
Walls / floor / ceiling @ 100 sq ft per person-day (included when Chamber is on). Steel auto-computes from chamber size. Absorber pieces per in-scope surface (cones + picture frame), installed @ 100 pcs/day. Door / vents / filters install is part of the baseline — itemize their materials in section 6.
work days
11 work + 2 travel + 4 weekend = 17 calendar days
Travel Days (each way)
Mob & demob phases when sent to Calendar
1
Vendor Lead Times (weeks)
Only enter what a vendor quote states — blank means no procurement window. Longest one governs.
0 WK
none set
Materials
$0
Absorber Mounting $0
0 pcs ÷ 120
0 pails
Cost / pail
$
Applicator setups
0 setup(s)
Bucket $4 + strainer $5 + 9" roller $5 + cover $7 · 2 @ 16×16×16
Cost / setup
$
Extension poles
0 ext.
Only when height > 12 ft · 1 per setup, max 3
Cost / extension
$
Chamber $0
Absorber $0
$0
Ferrite $0
Surfaces to tile
Coverage area
0 sqft
Tile size (mm sq)
mm
100 mm = EMC standard · 0.108 sqft/tile
Tiles to cover
0
Breakage extra
%
+ Breakage tiles
+0
Total tiles
0
Cost / tile
$
Tile subtotal
$0
Mounting · 1 screw + 1 washer per tile, dead-center hole · 0 each
Screws
0 cartons → $0
#12×1" self-drilling · PN 557299 · fastenersuperstore.com · 500/carton · 1-2 tier ($0/ea)
$/carton 1-2·3-4·5+
Washers
0 cartons → $0
#2 nylon shoulder washer · PN 336420 · fastenersuperstore.com · 2,500/carton · 1-2 tier ($0/ea)
$/carton 1-2·3-4·5+
Hardware subtotal
$0
Ferrite total
$0
Gross coverage — does not deduct door / penetrations
Extras beyond calculator
$0
Plywood $0
$0
Screws / Fasteners $0
Extras beyond absorber mounting
$0
Adhesive / Sealant $0
Extras beyond absorber mounting
$0
Ground Protection $0
$0
Misc $0
$0
Rental Equipment
Scissor Lift
19–26 ft electric
0
Day
$
Week
$
4-Week
$
Delivery
$
Pickup
$
Days
Forklift
5,000 lb
0
Day
$
Week
$
4-Week
$
Delivery
$
Pickup
$
Days
Scaffold
Werner · HD
0
Unit price · per scaffold
$
How the rental houses actually bill
- Day = one 24-hr rental day, priced for one 8-hr shift. Week = 7 calendar days / 40 hrs. 4-Week ("monthly") = 28 days / 160 hrs.
- The clock runs from delivery to pickup — weekends and holidays are charged even when the crew is off.
- Daily charges stop at the weekly rate; weekly charges stop at the 4-week rate (10 days = 1 wk + min(3 days, 1 wk)).
- Running past the shift allowance: United bills 1.5× for a double shift; state contracts bill daily ÷ 8 per extra hour (used here).
- Delivery and pickup are separate trips (typically $175–$750 each in metro areas). RPP / damage waiver is 15% of rent at United and Sunbelt; United's environmental fee is 2%, max $99.
Sources: United Rentals US Rental Service Terms & RPP terms; United Rentals and Sunbelt SC state contracts (#41156, #41431). Checked 9/25/2026.
Equipment total
$0
Total Contract
$0
Timeline
0days
Margin
$0
Per sq ft
$0
Cost Composition
Labor
0%
$0
Travel
0%
$0
Equipment
0%
$0
Materials
0%
$0
Margin
0%
$0
Cost per day
$0/day
Cost per day
Deposit (paid up front)
Surface Area
sqft
Person-Days
Line Item Breakdown
Scale 1.00×
Travel References
✈️
Google Flights
SAN → Destination
🏨
Google Hotels
Hampton / Courtyard tier
🚚
Enterprise · Truck
Pickup Truck
🚚
Hertz · Truck
Pickup Truck
🚚
Budget · Truck
Pickup Truck
Reference only · not included in quote or print
Archives
0 saved
Self-check · internal
Verifies the core calculations (absorber piece counts, turntable & raised-floor days, custom-task labor) against known-good values. Run it after any change to confirm nothing drifted. Doesn't affect your current bid.