Chambers
Start from template
1 · Site Discovery
3 · Crew & Labor
Crew size
3
Hourly rate
per hour
$
OT hrs/day
at 1.5×
Person-hours
0 hrs
7 · Travel & Per Diem
Airfare
nonstop · 6am–8pm · per person
$
Override: set to $1,200 flat if nonstop unavailable
Hotel · per room
2 techs share · per night
$
Per Diem · Flat
fixed $75/day · per person
$
Vehicle
day / crew
$
8 · Profit Margin
Applied to travel · equipment · materials
%
0%
Profit · $0
50%
Deposit · due at PO
Collected when the Purchase Order is issued
%
10%
Deposit · $0
50%
2 · Geometry · feet
0 sqft surface
Length
ft
Width
ft
Height
ft
4 · Schedule
Chamber scope · what's included
Chamber (walls · floor · ceiling)
Walls
0 d
Floor
0 d
Ceiling
0 d
Steel Shield
→ 0 d
Absorber
0 pcs → 0 d
Surfaces
Cone size
Per-surface breakdown
Surface
Cones · Frame · Total
Short walls (W×H, ×2)
0 · 0 · 0 ea
Long walls (L×H, ×2)
0 · 0 · 0 ea
Floor (L×W)
0 · 0 · 0
Ceiling (L×W)
0 · 0 · 0
In-scope total
0 · 0 · 0
Override total (0 = use auto)
pcs
Raised Floor (floor × 1.25)
Turntable
Ferrite install
Custom tasks
Auto total
0 work days
Walls / floor / ceiling @ 100 sq ft per person-day (included when Chamber is on). Steel auto-computes from chamber size. Absorber pieces per in-scope surface (cones + picture frame), installed @ 100 pcs/day. Door / vents / filters install is part of the baseline — itemize their materials in section 6.
work days
11 work + 2 buffer + 4 weekend = 17 calendar days
Travel Days (each way)
Mob & demob phases when sent to Calendar
1
6 · Materials
$0
Absorber Mounting $0
0 pcs ÷ 120
0 pails
Cost / pail
$
Applicator setups
0 setup(s)
Bucket $4 + strainer $5 + 9" roller $5 + cover $7 · 2 @ 16×16×16
Cost / setup
$
Extension poles
0 ext.
Only when height > 12 ft · 1 per setup, max 3
Cost / extension
$
Chamber $0
Absorber $0
$0
Ferrite $0
Surfaces to tile
Coverage area
0 sqft
Tile size (mm sq)
mm
100 mm = EMC standard · 0.108 sqft/tile
Tiles to cover
0
Breakage extra
%
+ Breakage tiles
+0
Total tiles
0
Cost / tile
$
Tile subtotal
$0
Mounting · 1 screw + 1 washer per tile, dead-center hole · 0 each
Screws
0 cartons → $0
#12×1" self-drilling · PN 557299 · fastenersuperstore.com · 500/carton · 1-2 tier ($0/ea)
$/carton 1-2·3-4·5+
Washers
0 cartons → $0
#2 nylon shoulder washer · PN 336420 · fastenersuperstore.com · 2,500/carton · 1-2 tier ($0/ea)
$/carton 1-2·3-4·5+
Hardware subtotal
$0
Ferrite total
$0
Gross coverage — does not deduct door / penetrations
Extras beyond calculator
$0
Plywood $0
$0
Screws / Fasteners $0
Extras beyond absorber mounting
$0
Adhesive / Sealant $0
Extras beyond absorber mounting
$0
Ground Protection $0
$0
Misc $0
$0
5 · Rental Equipment
Scissor Lift
0
Daily
$
Weekly
$
Monthly
$
Delivery
$
Days (0 = calendar)
Forklift
0
Daily
$
Weekly
$
Monthly
$
Delivery
$
Days (0 = calendar)
Scaffold
Werner · HD
0
Unit price · per scaffold
$
Equipment total
$0
Total Contract
$0
Timeline
0days
Margin
$0
$/sqft
$0
Cost Composition
Labor
0%
$0
Travel
0%
$0
Equipment
0%
$0
Materials
0%
$0
Margin
0%
$0
Daily Burn
$0/day
Daily Burn
Deposit Due
Surface Area
sqft
Person-Days
Line Item Breakdown
Scale 1.00×
Travel References
✈️
Google Flights
SAN → Destination
🏨
Google Hotels
Hampton / Courtyard tier
🚚
Enterprise · Truck
Pickup Truck
🚚
Hertz · Truck
Pickup Truck
🚚
Budget · Truck
Pickup Truck
Reference only · not included in quote or print
Archives
0 saved
Self-check · internal
Verifies the core calculations (absorber piece counts, turntable & raised-floor days, custom-task labor) against known-good values. Run it after any change to confirm nothing drifted. Doesn't affect your current bid.